
100 foot well = $1800 to $2100
200 foot well = $3600 to $4200
300 foot well = $5400 to $6300
400 foot well = $7200 to $8400
500 foot well = $9000 to $10,500
fees & setup = $750 (approximate)
pump and system = $2200 (approximate and includes boom truck)
100 feet trenching = $ 550 (100 feet of trenching for power
source and pipe at $5.50 per foot)
300 foot well with a 100 foot trench = $8,900-$9,200
Variables that can increase price:
- steel casing or additional liners if geology is unstable
- difficult access to the drilling site that requires heavy equipment to cut a road or level a drill pad

If you need advice in developing land or your dream home in rural California, call Bob at 530-906-1023.
No comments:
Post a Comment